Lot sheet · No. 05Sample

Sample lot 05, Davenport

Ward 9 · Davenport · 3-storey detached on a 12.19 × 38.10 m lot

Sixplex ward · up to 6 unitsR zone
Asking price$1,599,000Request an assessment

Key facts

Lot frontage
12.19 m
Lot depth
38.10 m
Lot area
464 m²
Zoning
R (d0.6)
Ward
9 · Davenport
Sixplexes permitted as-of-right
Existing building
3-storey detached

This is an illustrative sample lot. On live listings, dimensions come from the listing and the City's parcel data; a survey and the City's zoning map govern, and both are confirmed in a property assessment.

Lot plan · schematicnot to scale
STREETPOTENTIALENVELOPEEXISTINGPOSSIBLESEVERANCE LINE12.19 m38.10 m6.10 m6.10 mN
The dashed line marks where a split would fall, at half the 12.19 m frontage.

Development potential

Three paths for this lot, and what each one needs

Status reflects what the ward and zone generally permit and Lot Lens's severance screen. The lot's own standards, exceptions and site conditions decide what fits — that is what the assessment checks.

Path A

Convert the existing house

Permitted city-wide · up to 4 units

Add units within the existing house and lot: a basement suite, a rear or second-storey addition, or a garden suite. Four units are permitted city-wide in the low-rise residential zones; the design still has to meet the zone's standards.

What we verify
  • Structure and foundation condition of the existing house
  • Height, depth, setback and landscaping standards for additions
  • Building Code: fire separation, egress and ceiling heights
  • Garden suite eligibility on this lot
Path B

Build a multiplex

Up to 6 units as-of-right · Ward 9

Replace or substantially rebuild as a multiplex. Ward 9 is one of the nine wards where six units are permitted as-of-right; the building still has to fit the zone's height, depth, coverage and floor-space standards on this lot.

What we verify
  • Maximum height and storeys, building depth and length
  • Lot coverage, floor space and soft-landscaping minimums
  • Unit layouts and any bedroom-count limits for multi-unit buildings
  • Servicing capacity and tree protection on the lot
Path C

Split the lot

Needs a site-specific review

This needs a closer look: the zone label sets no frontage or area minimum, so a split needs a site-specific review.

What we verify
  • Frontage and area of both new lots against the zone minimums
  • Fit with the prevailing lot pattern on the street
  • Position of the existing building relative to the new line
  • Separate servicing and access for each parcel

Zoning context

Reading the zone label

PartMeaning on this lot
RResidential zone. Multiplexes of up to four units are permitted city-wide since 2023 — and up to six in this ward.
d0.6Maximum density of 0.6 times the lot area as gross floor area, unless the standards say otherwise.
(x…)A site-specific exception number, when one appears. It overrides the general standards, so it is always checked.

What applies here

  • 2023Four-unit multiplexes permitted city-wide in the low-rise residential zones (R, RD, RS, RT, RM).
  • 2025Six units as-of-right in Ward 23 and the eight Toronto & East York wards (Council, June 2025). Other wards can opt in through their councillor.
  • 2022No minimum parking requirement city-wide.
  • LotHeight, building depth, setbacks, lot coverage and floor-space standards still apply and are checked lot by lot, together with any exception or past variance decision.

Basis for this ward: Council 2025.PH22.4; By-laws 653-2025 and 654-2025 (Toronto and East York District). Source. Severance screen: halves must be at least 6.0 m wide and 70 % of the zone minimums to be flagged; rules version 2026.10.1. A screen, not a planning opinion.

Site constraints

Checked before any path is relied on

None of these are known for this sample lot. A property assessment confirms each one from City records, title and a site visit.

  • Heritage listing or designation
  • Ravine, natural feature or TRCA-regulated area
  • Tree protection — private and City-owned trees
  • Easements and rights-of-way on title
  • Servicing capacity — water, sanitary and storm
  • Site-specific zoning exceptions and past variances
  • Grading, drainage and flood risk
  • Existing building condition and setbacks

Next step

Request a property assessment

We review the lot against its zone standards, exceptions and site conditions, then explain which path is worth pursuing and what it would take.

  • Zoning and exception check against the City's records
  • Site constraints review from title and a visit
  • The three paths compared, with the approvals each needs
What are you considering?
We reply by email. An assessment is not legal, planning or engineering advice.